Highway Runoff Management

I-95 Corridor, VA — Transportation Project

Project Overview

Working with a state transportation authority, Total Stormwater Solutions designed and installed a linear green infrastructure system along a 6-mile highway corridor. The project replaced failing roadside ditches with a continuous bioswale system integrated with sediment forebays at major inlets, significantly reducing pollutant loads to adjacent waterways.

Scope of Work

  • Assessment of existing drainage conditions along 6-mile corridor
  • Bioswale design for 3.2 miles of roadside application
  • Sediment forebay design at 12 major drainage inlets
  • VDOT permit coordination and plan approval
  • Native grass and wildflower seeding specification
  • Construction phasing plan to minimize traffic impacts
  • Establishment monitoring and corrective seeding program

Results

  • 95% TSS removal efficiency in post-construction monitoring
  • Eliminated chronic erosion at 8 problem locations
  • Native plant establishment reduced maintenance frequency
  • Template adopted by VDOT for similar corridor projects